27 MW Captive Power Plant (140 TPH, 88 Kg / cm2 boiler) consisting RO and DM Plant (capacity 36 cu. Meter/ hour) at Jawaharpur, Sitapur Prop. Dalmia Cement (Bharat) Ltd. Worked as Chief Chemist since erection and commissioning of DM Plant in M/S HEG (Hindustan Electro Graphite), Mandideep, Distt- Raisen, Near Bhopal, (MP) consisting 30 MW
Read MoreDesigned Boiler supporting structures for 250MW Chabbra Thermal Power Plant. Worked along with ALSTOM USA on the design of the main floors for the 660MW Barh Thermal Power Plant Worked on Boiler ID system supporting structures for 500MW Koderma, Durgapur, Anpara-D, Ukai Thermal Power Plants.
Read MoreEngineer's DegreeMechanical EngineeringSecond. 1995 - 1999. Working as a Assistant Manager in Dalmia Cement, Ariyalur from June 2012 to till date in 125 TPH IJT CFBC Boiler and 27 MW SIEMENS turbine,25 TPH Dosion WTP,150 Coal handling plant,ACC and etc.
Read MoreFeb 09, 2013 · 2. M/s Dalmia Cement (Bharat) Ltd. Worked as Boiler Water Analyst in 25 MW Power Plant (87 Kg/cm2, 120 TPH IJT make Boiler, 35. m3/hr DCS controlled RO DM MB with PSF Unit) at Ramgarh, Sitapur (U.P.) from January 29, 2008 & to. October 19, 2009. 3. M/s Balrampur Chini Mills Ltd.
Read MoreM/s Aayush Corporation bagged yet another prestigious order from M/s Dalmia Bharat Cement OCL Plant - Orissa – PH & AQC Boiler with Deaerator, Rack & Turbine for Detail Engineering For Cement Proje. M/s Aayush Corporation bagged yet another prestigious order from M/s Thermax B & H - POW.
Read More